Planning permission is not normally required as the PODs are temporary structures. However you should check there are no local restrictions where you live, especally for listed buildings or area's within national parks.
The PODs have their own base so all that is required is level, well drained ground. The PODs have been installed successfully on grass and paved areas.
Our team of fitters will usually be able to install your POD in 1 day
This is usually 3/4 weeks, if we can do it sooner then we will, obviously in busy times (spring/summer) this may be longer
Yes. Most of our POD buyers have taken for this option, we fit a led light, hanging heater and a double socket. These are weather safe and compliant to relevant IP rating. For additional safety we also fit a RCD unit. This option is a additional £320
Just visit the Contact Us tab and fill in the inquiry form or call us on 07968872136 and we will arrange to come round and advise you
When ordering we require a 50% deposit. The balance is payable on completion of the installation. We accept all major credit / debit cards and bank transfer (bacs) payments
Watch this space, it’s something we’re working on!
Copyright 2021© All Rights Reserved